Oklahoma Sign Makers
(405) 281-3765Start a Project

CAPABILITIES · WAYFINDING

Wayfinding.

When people cannot find the entrance, the suite, or the parking, they call you instead. Directional systems for campuses, medical offices, and multi-building sites — planned as one system rather than one sign at a time.

WHAT'S INCLUDED

Everything that gets someone from the road to the room.

Site & Entry Directionals

Vehicular signs at the drive, sized and placed for the speed people are actually moving.

Parking & Lot Identification

Lot names, visitor and reserved stalls, and the accessible spaces the code requires.

Building Identification

Building letters and numbers on multi-building sites, so an address is findable from the road.

Interior Directionals

Corridor and floor-level panels that carry a visitor from the front door to the right room.

Regulatory & Code Signage

Accessible parking, fire lanes, and required notices — in the colors, sizes, and mounting heights the code specifies.

Sign Families & Standards

One drawing set covering every sign type on the site, so anything added later matches what is already there.

BEFORE YOU START

What makes a system actually work.

Wayfinding fails in predictable ways, and most of them are settled long before anything gets fabricated.

People read at speed

A driver gets about two seconds with each sign. Message count and letter height decide whether it works far more than the design does.

Name everything once

The lot, the building, and the door need the same name on every sign, on your website, and in the directions your staff give over the phone.

A sequence, not a set of signs

Every decision point needs a sign, and every sign needs to confirm the last one. The gaps are where people turn around.

Regulatory rules still apply

Accessible parking, fire lanes, and traffic control carry their own specifications, and they are not the place to be creative.

Plan for tenants moving

Departments and tenants move. Panels designed to swap cost a fraction of signs that have to be replaced.

HOW IT WORKS

Same four stages, every project.

01

Design

From scratch or from your existing artwork — checked against code before it is built.

02

Permits

Zoning, sign permit, electrical, and any district review, filed and tracked.

03

Fabrication

Built to spec in-house, engineered for Oklahoma wind and sun.

04

Installation

Scheduled, crewed, and inspected — with minimal disruption to your business.

Tell us about the site.

Four steps, a few minutes. We will come back with the right next step — not a generic quote.

Start a project →

or call (405) 281-3765