Permits are the part of a sign project that decides your date, and the part most people find out about last. We handle zoning, submittal, and inspection in every municipality in the metro — including the ones with a reputation.

WHAT'S INCLUDED

Everything that has to clear before fabrication starts.

Zoning Review

What your address is actually allowed — type, height, area, and count — checked before anyone designs to a size you cannot have.

Sign Permit Submittal

Drawings, site plans, and applications prepared and filed to each municipality's format, then tracked until they issue.

Variances & Appeals

When what you need exceeds what the code allows, the case that has to be made and the board it goes in front of.

Historic & District Review

Overlay districts add a design review on top of the sign permit, with their own calendar and their own standards.

Structural Engineering

Sealed drawings for freestanding and high-mounted signs, sized for Oklahoma wind load and coordinated with the permit set.

Electrical Permits & Inspection

Illuminated signs carry a separate electrical permit and a final inspection. We schedule and meet both.

BEFORE YOU START

Why permits drive the schedule.

Fabrication is predictable. Approval is not. Understanding that order is the difference between a date you can hold and one you keep moving.

Every city is its own system

Oklahoma City, Edmond, Norman, and Moore each run their own process, format, and review calendar. What passes in one is not automatically fine in the next.

The landlord reviews too

Most shopping centers have sign criteria that govern more tightly than the city does, and landlord approval usually has to come first.

Corrections are normal

A first submittal often comes back with comments. Answering them quickly and correctly matters more than the original filing date.

Design to the code, not around it

It is far cheaper to check the allowance before the design than to redraw a sign that was never permittable at that size.

Permits outlast fabrication

Building the sign runs in weeks. Approval can run in months, and it runs first. That order is the single biggest driver of your install date.

HOW IT WORKS

Same four stages, every project.

01

Design

From scratch or from your existing artwork — checked against code before it is built.

02

Permits

Zoning, sign permit, electrical, and any district review, filed and tracked.

03

Fabrication

Built to spec in-house, engineered for Oklahoma wind and sun.

04

Installation

Scheduled, crewed, and inspected — with minimal disruption to your business.

Tell us where the building is.

Four steps, a few minutes. We will come back with the right next step — not a generic quote.

Start a project →

or call (405) 281-3765